Clients

Key Marine serves both the public and private sectors. Listed below are our clients grouped by their industry sectors as well as the various types of projects that we manage today.

Commercial Projects

  • Changi Airport Group (Singapore Changi Airport Terminal 1, 2, 3 & Budget Terminal)
    • Installation of filtration system for Cooling Tower
    • Installation of working platform for Cooling Tower
    • Overhaul of Exhaust Fan System
  • Carrier
    • American Club
      • AHU Coil Replacement
    • SGX Tower
      • Replacement of 10”Ø Victaulic Valve
      • Fabrication of Chiller hoisting frame
    • Singapore Changi Airport Terminal 1 
      • Fabrication of Chiller hoisting frame
    • Singapore Changi Airport Terminal 1 & 2
      • Replacement of Cooling Tower
      • Replacement of Condenser & Chilled Water Pumps
      • Fabrication of Chiller hoisting frame
      • Air Handling Station
      • AHU Coil  Replacement
    • Lucky Chinatown Point
      • Overhaul and Annual Shutdown of Chiller
      • Replacement of Cooling Tower Valves
    • Mindef Camp
      • Overhaul Cooling Tower Fan Hub
      • Fabrication of Chiller hoisting frame
    • Suntec City
      • Fabrication of Chiller hoisting frame
    • Marina Square
      • Replacement of Valves
      • Freezing Works
    • US Embassy
      • AHU Coil Replacement
    • Ngee Ann City
      • AHU Coil Replacement
      • FCU installation
    • ICA Building
      • FCU installation
      • Pump repair & overhaul
  • Yat Yuen Hong Company Ltd
    • International Building
      • AHU noise and vibration reduction work
      • Pump overhaul works
    • The Concourse
      • Water Tank replacement
  • CA Facilities
    • Changi Airport Terminal 1 
      • Repair of Cooling Tower
      • Repair of AHU
    • Control Tower
      • Servicing of Chiller
      • Repair of Cooling Tower
  • Keppel FMO
    • Temasek Polytechnic
      • Vibration Reading for Pump and motor
      • Pump Overhaul
  • Ngee Ann Development Pte Ltd
    • Ngee Ann Shopping Centre
      • Cooling Tower Overhaul
      • Pump Overhaul
      • Fountain Pump
        • Service Pump
        • Repair damaged Pipe works

Residential Projects

  • Chan Kok Hong
    • The Bayron
  • Far East Organization
    • Point Loma Condominium
  • MCST 7686
    • Peace Mansion/ Centre
      • Pump Overhaul Works
      • AHU Replacement Works

Industrial Projects

  • Carrier
    • Trivec
    • Singapore Press Print Centre
    • ST Singapore Assembly
  • ACMV
    • Dupont Singapore
    • Singapore Changi Cargo Building “C”
  • Trane Singapore
    • Sembcorp Utilities at Jurong Island

Hotel & Leisure Projects

  • Copthorne Orchid Hotel
  • Pan Pacific (Orchard)
  • The Fullerton Hotel
  • Furama City Centre

Maintenance Projects

  • Swiss Club (Air-Conditioning & M&E Maintenance)
  • Holland Club (Air-Conditioning & M&E Maintenance)

Specialist Projects

  • Carrier Singapore Pte Ltd
    • Hilton Hotel
      • Freezing work for the replacement of 8”Ø Gate Valve
    • Marina Square
      • Freezing work for the replacement of 10”Ø Check Valve
  • Coolmac Engineering Pte Ltd
    • Freezing work for the installation of FCU
    • Hot-tapping work
  • Yat Yuen Hong
    • The Concourse
      • Hot-tapping work
    • International Building
      • Hot-tapping work
  • International Plaza
    • Freezing work for the installation of FCU
    • Replacement of FCU

Project Management

  • Carrier Singapore Pte Ltd
    • Changi Airport Terminal 2
      • A&A Project – Replacement of Cooling Towers & associated works at “E” & “F” Piers (2007)
      • Replacement of AHU Project (2011)
    • Changi Airport Terminal 1
      • A&A Project – Replacement of Cooling Towers & associated works at “C” & “C” Piers (2009)
      • Replacement of AHU Project (2011)
    • Changi Airport Terminal 1 & 2 
      • Replacement of AHS Fans (2007)
    • Furama City Centre Hotel 
      • A&A Project – Replacement of ACMV Works (2009)
    • Furama River Front Hotel  
      • A&A Project – Replacement of ACMV Works (2011)
    • Ginza Shopping Centre
      • Replacement of Cooling Tower Silencer Hood
    • ICA Building
      • Installation of Fan Coil Units
    • Orchard Parade Hotel 
      • A&A Project – Replacement of ACMV Works (2011)
    • Parklane Shopping Centre
      • Replacement of Cooling Tower structure (2005)
      • A&A Project – Replacement of ACMV Works (2008)
    • Peace Centre
      • A&A Project – Replacement of ACMV Works (2007)
      • Replacement of AHU
    • PSA Tanjong Pagar Complex 
      • A&A Project – Replacement of ACMV Works (2011)